Tag Archives: H20-681-ENU practice test

10 Dec

Valid H20-681-ENU HCS-Field-Smart PV Controller Exam Questions

Planning for H20-681-ENU HCS-Field-Smart PV Controller (Huawei certified Field specialist-Smart pv Controller) exam? Valid H20-681-ENU HCS-Field-Smart PV Controller Exam Questions have been released on December 10, 2018, which contain real H20-681-ENU exam questions with accurate answers to ensure your success in Huawei H20-681-ENU Exam.

Try H20-681-ENU free questions

Please try H20-681-ENU free questions to test the high quality of Valid H20-681-ENU HCS-Field-Smart PV Controller Exam Questions now. There are 20 free questions of the full H20-681-ENU exam questions. After you check all Huawei H20-681-ENU free questions, you will find you want to get the full version of HCS-Field-Smart PV Controller H20-681-ENU exam.

Begin to Test:

1. The NetEco1000S is an equipment-level monitoring software for inverters. It is mainly used in SUN2000, SUN8000 and third-party inverters.

Question 1 of 20

2. The device that cannot be upgraded by the NetEco1000S system for remote software is ()

Question 2 of 20

3. Regarding the description of SmartLogger1000 and SmartLogger2000, the error is () (Multiple Choice)

Question 3 of 20

4. Huawei Smart Array Controller SmartACU2000B is recommended to be larger than () mm from the ground when installing.

Question 4 of 20

5. About Huawei's smart photovoltaic solution grounding system design, which of the description is correct? (Multiple Choice)

Question 5 of 20

6. When the debugging of the Huawei PLC communication network is started, which of the following description about the operation to set the anti-crosstalk is correct? (Multiple Choice)

Question 6 of 20

7. When installing the AC line of Huawei SUN2000 inverter, it is recommended that the stripping length of the insulation layer be 2mm~3mm longer than the crimping area of ​​the OT terminal cable to facilitate wiring. After pressing the terminal, the crimping line needs to be covered with a heat shrinkable sleeve cutting edge tape.

Question 7 of 20

8. During the operation of Huawei SUN2000L household inverter, the inverter "DC SWITCH" can be directly turned "OFF" to perform shutdown operation.

Question 8 of 20

9. Which of the following designs is not suitable for a mountain photovoltaic power station system?

Question 9 of 20

10. The Huawei PID module adjusts the PV+ or PV-to-ground voltage of the panel by injecting a voltage between the N-line and the ground of the isolation transformer, thereby suppressing the PID effect of the panel.

Question 10 of 20

11. The baud rate default is when Huawei's SUN2000 inverter communicates by PLC mode ().

Question 11 of 20

12. The recommended bottom installation space for the Huawei SUN2000 inverter is ().

Question 12 of 20

13. When the Huawei SUN2000 inverter is alarmed and cannot be connected to the network, the alarm ID is 313-1 (low insulation resistance). Which of the following measures can be taken to troubleshoot or try to solve? (Multiple Choice)

Question 13 of 20

14. When the Huawei PID module is applied to the SUN2000 scenario, which of the following description is correct? (Multiple Choice)

Question 14 of 20

15. Which of the following inverter parameters can be modified by the advanced user login Huawei SUN2000 APP?

Question 15 of 20

16. The adjustable range of Huawei SUN2000 inverter power factor can be ( ).

Question 16 of 20

17. EHS includes three aspects of environment, occupational health and safety. Among them, occupational safety is the most important. Personnel behavior can neglect the impact on the environment and occupational health under the premise of ensuring safety.

Question 17 of 20

18. The in-out line mode of Huawei's intelligent sub-array controller SmartACU2000B adopts the method of going in and out.

Question 18 of 20

19. The default value of the RS485 communication address of the Huawei PID module is 1. To modify the RS485 communication address, you can modify it by logging in to the SmartLogger's WEBUI interface.

Question 19 of 20

20. In the Smartlogger WebUI interface, when the "Active Power Control" parameter is configured as "Enable", the Smartlogger can perform active power control on the managed inverter.

Question 20 of 20


 

Get H20-681-ENU Full Version

After read all H20-681-ENU free questions, please go on for the full version of Valid H20-681-ENU HCS-Field-Smart PV Controller Exam Questions. HCDAtest offers 194 real exam questions and answers as a full to help you pass HCS-Field-Smart PV Controller (Huawei certified Field specialist-Smart pv Controller) exam.

Get H20-681-ENU Full Version

Get H20-681-ENU Full Version

Valid H20-681-ENU HCS-Field-Smart PV Controller Exam Questions from HCDAtest are the best materials for Huawei H20-681-ENU exam. Any Questions, please contact me freely: [email protected].


Recent Posts


Tags

H12-211-ENU H12-211-ENU online test H12-211-ENU practice test H12-221 H12-221-ENU H12-221-ENU online test H12-222 H12-222-ENU H12-223 H12-223-ENU H12-261 H12-261-ENU H12-261-ENU online test H12-261-ENU practice test H12-261-ENU questions and answers H12-311-ENU H13-511-ENU H13-511-ENU exam dumps H13-511-ENU latest dumps H13-511-ENU questions and answers H13-511-ENU real exam questions H13-511-ENU real questions H13-511-ENU test prep H13-511-ENU training materials H13-611-ENU H13-623-ENU exam dumps H13-629-enu H19-301-ENU exam dumps H19-307-enu H19-308 H19-308-ENU H19-308-ENU exam dumps H31-211-ENU H31-211-ENU exam dumps HCDA (Carrier IP) HCNA HCNA-Cloud-BCCP HCNA-HNTD HCNA Storage HCNP HCNP-R&S-IENP HCNP-Storage Huawei Certified Internetwork Expert-Routing & Switching Huawei Certified Network Associate-Building Cloud Computing Platform Video Conference